Location: Kenora, ON Year: 2010 Cost: $5,900,000 This 18,000sqft fire and emergency services and regional training centre consist of four bays and includes two classrooms capable to accommodate more than 60 students. The new structure was built on a foundation of concrete pads, piers, and footings; the structure itself consists of hollow core, concrete block walls, hss colomns, glulam purlins … Read More
winkler police station reno & addition
Location: Winkler, MB Year: 2013 Cost: $3,200,000 The new addition and upgrades incorporate an enhanced public entrance and reception area as well as additional vehicle bays, improved detainee handling areas, expanded offices to meet staffing needs and new staff facilities inclusive of a lunch room, locker room and fitness room. LDA was responsible for the overall structural design and preparation … Read More
hsc mental health crisis response centre
Location: Winnipeg, MB Year: 2012 Cost: $12,300,000 This 2 Storey 27,000 sqft facility provides numerous washrooms, triage, exam rooms and patience waiting rooms on the first floor and the 2 nd floor consists of offices and meeting rooms. The entire facility has barrier free access from washrooms and treatment rooms to public entrances and access by elevator to the second … Read More
Carberry School
Location: Carberry, MB Year: 2008 Cost: $11,452,600 Phase I consisted of the expansion of the existing school to become a 28000 sqft, 2 Storey structure. The building was comprised of load bearing concrete walls, hollow core pre-cast floor, steel structure and a flat 2ply modified bitumen roof. The foundation is made of compacted expanded-base concrete piles. Phase II consisted of … Read More
calvin christian collegiate gym addition
Location: Winnipeg, MB Year: 2015 Cost: $3,200,000 This project consisted of adding an additional 14,000sqft to the areas of the gymnasium, change rooms, public washrooms, storage areas, kitchen, weight room, gymnasium office and entrance foyer of the collegiate. LDA was responsible for the structural design and preparation of the contract working drawings for the foundations, grade beams, floor systems and … Read More
o’chiese first nation school
Location: O’Chiese First Nation, AB Year: 2015 Cost: $11,452,600 This 45,000sqft school is location on the O’Chiese First Nation in Alberta. It includes classrooms, a library, science room, gymnasium, shops, a home economics room, washrooms and administrative offices. It serves as a central meeting area for the community and it’s approximately 1000 residents. LDA was responsible for the overall structural … Read More
poplar hill first nation school
Location: Poplar Hill First Nation, ON Year: 2016 Cost: $21,614,000 This 25,000 sqft school is located in Poplar Hill First Nation, ON. The new school is a the focal point for the community serving as an education centre as well as a hub for a wide range of education activities. It has been designed to be a safe place … Read More