Location: Winnipeg, MB
Year: 2015
Cost: $18,000,000
This facility opened in the spring of 2015. The 102,700sqft facility includes two NHL size ice rinks, raised
spectator concourse, tournament equipment storage areas, graciously spaced uni-sexed change rooms
and a club change room suite. It also includes a tenant fitness area, café/food court, administrative area
and a retail space for their pro shop. In addition, it links to the existing facilities and community
amenities.
LDA was responsible for the structural design and preparation of design documents, along with the
specifications for tender. As well, we provided construction phase services including site inspections
and final certification.